Total maintenance program – Rockwell Automation 1329R Vertical Mount, In-Line AC Motors User Manual
Page 10

10
Vertical Solid Shaft Normal Thrust and In-Line AC Motors
Lubrication Frequency
Ball Bearings
Roller Bearings
For Roller Bearings – divide the above times by 2.
Recommended Volume
Lubrication Procedure
Anti-friction bearings may be lubricated with the motor running or
stationary. However, stationary with the motor warm is preferred.
1. Locate the grease inlet, clean the area and replace the pipe plug
with a grease fitting (if the motor is not equipped with grease
fittings).
2. Add the recommended volume of the lubricant using a hand
operated grease gun.
3. Run the motor for two hours.
4. Replace the pipe plug in grease inlet.
Total Maintenance Program
Allen-Bradley can provide a wide range of maintenance programs to
help you reduce downtime, improve productivity and increase profits.
Capabilities include:
•
Electrical and Mechanical Start-Up Service
•
Electrical Preventive Maintenance
•
Mechanical Preventive Maintenance
•
Vibration Analysis
•
Mobile Van Repair Service
•
Balancing and Alignment Service
•
Maintenance Service
•
24-Hour Technical Support
•
Modernization Service
Standard Conditions:
Eight hours per day; normal or light loading, clean, 40 degree C
(100 degrees F) maximum ambient.
Severe Conditions:
Twenty-four hour per day operation or shock loading, vibration, or in
dirt or dust at 40-50 degrees C (100-120 degrees F) ambient.
Extreme Conditions:
Heavy shock or vibration, or dust.
Horsepower
Condition
Standard
Severe
Extreme
1 through 7-1/2 HP, 1800 RPM & slower
2 Years
6 Months
1 Month
10 through 75 HP, 1800 RPM and slower
1 Year
3 Months
1 Month
100 HP & greater, 1800 RPM and slower
1 Year
3 Months
1 Month
All over 1800 RPM
6 Months
2 Months
1 Month
Frame Size
1800 RPM & Slower
3600 RPM
182 through 215
0.5 Cu. In.
0.5 Cu. In.
254 through 286
1.0 Cu. In.
1.0 Cu. In.
324 through 365
1.5 Cu. In.
1.5 Cu. In.
404 through 449
2.5 Cu. In.
1.0 Cu. In.