beautypg.com

Before operating the unit, Assure at least 30% of space, Shelf board samples 15kg – Yamato Scientific DG400 Drying Ovens for Laboratory Tools User Manual

Page 9

background image

7

2. Before operating the unit

Installation proceduresprecautions

(1)

Select an installation site.

Make sure that all of four legs are securely on a flat surface.

Two legs on the unit front are adjustable. Adjust them so that the installed unit will not be
unstable. Turning the adjuster clockwise raises it and turning it anti-clockwise lowers it.

(2) ・

Placement of the drain pan.
Be sure to place a drain pan to receive
water generated during the drying
process.

(3)

Install shelf boards.

Install shelf pegs at heights you want on the right and left shelf posts in the internal bath of

the main body.

Completely push shelf boards by sliding to the end.

*Take care to put each shelf board on correct pairs of right and left shelf pegs.

Make sure that shelf boards will not fall nor rattle.

Withstand load of each shelf board is 15kg in even loading. When putting instruments,
arrange them as dispersed as possible.

 

Shelf board

Samples

15kg

Put instruments with appropriate spaces between them. Too many instruments may prevent

proper temperature control. To assure proper temperature control, put instruments with a
space at least 30% of the shelf board area.

Assure at least 30% of space.

Drain pan