Operation – UVP Spot-Lite System User Manual
Page 6

Spot-Lite Users Guide
Operation
Positioning
Position the unit close to the area where the curing is to take place and in a position where any light
discharge is away from the line of sight of the user. Ventilation should be allowed at the rear of the unit
which should not be closer than 6 to any wall.
Interconnections
Mains lead this should be attached to the rear of the base unit in the socket located below the ON/
OFF switch.
Foot switch the attachment on the end of the foot switch lead should be plugged into the socket
provided on the back of the Spot-Lite. To remove the lead push the small release button on top of the
attachment and the pull lead from the socket. (NB. This switch allows the Spot-Lite to be activated by
the operators foot thus allowing both hands free for conducting the curing operation itself.)
Light Guides these should be inserted into the front bulkhead as follows:
• Remove the blanking plug from the first socket required by first loosening and removing the clamp-
ing screw
• Inset the light guide into the socket and tighten the clamping screw
Note. Beware not to overtighten the clamping screw as this may damage the quartz plug located in
the end of the light guide
WARNING: DO NOT REMOVE ANY OF THE PLUGS FROM THE FRONT BULKHEAD IF YOU DO
NOT INTEND TO REPLACE IT WITH A LIGHT GUIDE SINCE UNPROTECTED SOCKETS WILL
EMIT HIGH INTENSITY UV AND WHITE LIGHT WHEN THE UNIT IS SWITCHED ON.
Set Up Procedure
Once the Spot-Lite unit has been assembled as described above, the mains lead can be plugged into
the mains supply (220/240V 50Hz or 115V/60Hz 3 amp) and switched on at the ON/OFF switch lo-
cated at the back of the unit. A RED indicator lamp should not be illuminated. 3 4 minutes should be
allowed for the unit to warm-up before curing can commence. During this time the timer can be set as
outlined below.
6