4.1 Pre-Installation Assembly (Continued)
6. With the Hot-Pak assembled, attach the safety relief valve to the open connection
in the upper left side of the shell (Figure 4-4). This valve should be piped to an
adequate drain.
7. Now that the Hot-Pak is assembled, the unit can be installed in the piping
network. A visual check of components is recommended before installation.
4.2 Installation
Using Figure 4-4 below, follow the steps outlined to install piping for the Hot-Pak.
Before making any piping connections, assure that all piping is clean and free of
any foreign material such as debris or scale. Foreign material in the piping can
cause damage to the unit and/or affect the performance and operation. Manual
shutoff valves should be installed upstream/downstream from all connections to
act as an isolation device. These valves should be in the closed position and
remain so until the installation is complete.
Figure 4-4 Piping Installation