4.1 Pre-Installation Assembly (Continued)

6. With the Hot-Pak assembled, attach the safety relief valve to the open connection

in the upper left side of the shell (Figure 4-4). This valve should be piped to an
adequate drain.

7. Now that the Hot-Pak is assembled, the unit can be installed in the piping

network. A visual check of components is recommended before installation.

4.2 Installation

Using Figure 4-4 below, follow the steps outlined to install piping for the Hot-Pak.

Before making any piping connections, assure that all piping is clean and free of

any foreign material such as debris or scale. Foreign material in the piping can

cause damage to the unit and/or affect the performance and operation. Manual

shutoff valves should be installed upstream/downstream from all connections to

act as an isolation device. These valves should be in the closed position and

remain so until the installation is complete.