4.1 Pre-Installation Assembly (Continued)
4. Unbolt shipping bracket (Figure 4-2) from base of crate. Use provided lift lugs to
slowly lift the unit from the crate. Once cleared from the crate continue to raise the
Hot-Pak
to a vertical position. While lowering unit onto legs (Figure 4-3) align
mounting tabs on the Hot-Pak with mounting holes on the stand assembly. Use
supplied bolts to attach the Hot-Pak to the stand. Remove shipping bracket and lift
lugs.
There is a potential for severe personal injury or death if proper rigging
procedures are not followed. Rigging should be done with proper
equipment and qualified personnel.
MOUNTING
TABS (4)
LIFT LUG
LIFT LUG
SHIPPING
BRACKET
Figure 4-2 Crated Assembly
5. Once the Hot-Pak is attached to the stand, the unit can be bolted to the floor.
(Figure 4-3).
(4) BOLT, 5/8‐11, 1.5"
FLOOR
MOUNTING HOLES
Figure 4-3 Stand Assembly #2