beautypg.com

Thrush co – Thrush DSVE Series User Manual

Page 15

background image

Thrush Co.

Manual #9636-0550

4.1 Pre-Installation Assembly (Continued)

4. Unbolt shipping bracket (Figure 4-2) from base of crate. Use provided lift lugs to

slowly lift the unit from the crate. Once cleared from the crate continue to raise the
Hot-Pak

to a vertical position. While lowering unit onto legs (Figure 4-3) align

mounting tabs on the Hot-Pak with mounting holes on the stand assembly. Use
supplied bolts to attach the Hot-Pak to the stand. Remove shipping bracket and lift
lugs.

There is a potential for severe personal injury or death if proper rigging

procedures are not followed. Rigging should be done with proper

equipment and qualified personnel.

MOUNTING

TABS (4)

LIFT LUG

LIFT LUG

SHIPPING

BRACKET

Figure 4-2 Crated Assembly

5. Once the Hot-Pak is attached to the stand, the unit can be bolted to the floor.

(Figure 4-3).

(4) BOLT, 5/8‐11, 1.5"

FLOOR

MOUNTING HOLES

Figure 4-3 Stand Assembly #2

This manual is related to the following products: