Pump installation – TapeTech CTPMP Bazooka Continuous Flow Pump Repair User Manual
Page 6
![background image](/manuals/573960/6/background.png)
Pump Removal
6
3A0912A
Pump Installation
1.
Extend pump piston rod 1.5 in.
2.
Install pump pin (7b). Verify retaining spring is in
groove of connecting rod.
NOTE: Pin should be installed from the top side of the
pump. Make sure to control the pump pin when installing
so that it does not fall into the pump module.
3.
Push pump up until pump threads engage.
4.
Screw in pump until threads are flush with drive
housing opening.
5.
Align pump outlet to right side so that hose can be
reassembled.
6.
Screw jam nut up toward drive housing until nut
stops. Tighten jam nut by hand, then tap 1/8
to 1/4 turn with a 20 oz. (maximum) hammer to
approximately 75± 5 ft-lb (102 N•m).
7.
Replace pump rod shield (48) and torque two
screws (40) to 30 - 34 in-lb.
8.
Reconnect material hose (79) to pump (18a).
9.
Replace Power Module, see page 5.
1.5 in.
ti7171a
7b
ti13093a
ti15924a
ti15621a
ti15923a
ti15925a
ti15619a
48
40
ti15616a
79
18a