Mise en route start-up inbetriebsetzung – Sulky VISION 2 DPB User Manual
Page 37
![background image](/manuals/573520/37/background.png)
•
1
1
•
Select the EPAN menu
•
2
2
•
Check that: • the fertiliser selection is correct,
• the hydraulic shutters are closed.
•
3
3
•
Select
and carry out the stationary test.
•
4
4
•
Select the application rate/ha:
use the numeric pad and confirm by pressing
.
•
5
5
•
You are spreading in DPA mode.
You can adjust the application rate/ha: select
or
and return to baseline flow rate by selecting
.
•
6
6
•
You can start the TRIBORD or select
to adjust the RH side or select
to adjust the LH side.
Return to the same left/right application rate by selecting
.
37
Mise en route
Start-up
Inbetriebsetzung
•
1
1
•
Select the REG menu.
•
2
2
•
Make sure that all parameters are correctly entered and saved: rate coefficient
and working width
.
•
3
3
•
Select your fertilisers
.
A
•
1
1
•
Select the INFO menu.
•
2
2
•
Select the PAR/TOT mode.
•
3
3
•
Reset each counter to zero with the RAZ function.
•
4
4
•
As soon as you hear an alarm sound or see a bell appear on the screen, select
to determine the cause[s].
Select OK to return to the baseline menu.
•
5
5
•
Select
to save.
B
C
GB