beautypg.com

Stack-On AC-2 Bow Cabinet User Manual

Page 3

background image

Shelves must be installed before installing foam.

Install bow hangers before mounting the cabinet to the wall.

Your foam kit will cover the inside walls of one side of the cabinet. Install the

foam from the bottom up. The foam panels have an adhesive coating that is

covered by a removable backing. Before removing the backing, place the foam

in the cabinet as described below to make sure you are using the correct size

foam for each step. For best results, remove the backing by pinching the

backing and the foam together at a corner and then peeling away the backing.

Assemble the bow hangers to the

cabinet sides or to the center partition

with the screw and washer as shown.

To assure that your bows hangs properly inside and outside the cabinet, use

only the mounting hole shown above. There are 2 mounting holes in each side

of the cabinet and 2 mounting holes in the center partition. Use these

mounting hole positions to configure your cabinet as shown below.
NOTE: The foam lining you installed will cover some of these mounting

holes. Push the screw through the foam to mount the bow hanger.

For the cabinet configuration where there

are shelves on one side, mount one bow

hanger on the center partition in the upper

or lower hole located behind the center of

the partition. Do not use the first set of holes.

Mount one bow hanger on the inside of the

cabinet on the outside wall as shown in the

cut away image.

For the cabinet configuration where there

will be bows on both sides of the center

partition, mount a bow hanger on each side

of the center partition. Mount one bow

hanger on the inside of both the left and

right side walls of the cabinet.

You can also mount 2 bow hangers on the

outside of the cabinet in the upper front

mounting holes.

Make sure there is room on the outside to

store and access your bows and equipment.

Hang your bows on all the bow hangers

before mounting the cabinet to a wall .

Start at the bottom of the cabinet. Remove

the foam backing and gage the foam to the

inside bottom and back of the cabinet.

Apply the upper foam panel by gaging the

upper side foam to the top of bottom side

foam and to the back of the cabinet.

40298-1202

18

3

FOAM INSTALLATION

BOW HANGER INSTALLATION

16 1/2"

[419mm]

22"

[559mm]

11 1/2"

[292mm]

22"

[559mm]

10 1/4"

[260mm]

22"

[559mm]

1. Cabinet Side Foam (2)

Center Partition Locations

Cabinet Side Locations

Start with the bottom cabinet back foam.

Remove the foam backing and gage the foam

to the inside bottom of the cabinet and to the

lower side foam. Gage the upper back foam

to the top of the bottom back foam and to

the upper side foam.

2. Cabinet Back Foam (2)

Start with the bottom cabinet partition foam.

Remove the foam backing and gage the foam

to the inside bottom of the cabinet and to the

lower back foam. Gage the upper partition

foam to the top of bottom partition foam and

to the upper back foam.

Place the foam without the backing on the

bottom of the cabinet

3. Cabinet Partition Foam (2)