RKI Instruments SDM-E2 User Manual
Page 47

Connecting Instruments to the PC Controller Program • 42
LED will begin to flash amber. If the batteries are fully charged, the CHARGE
LED will become solid green again after about 5 minutes. Typically a bump test
or calibration will be initiated before this happens. See “Charging an
Instrument in an SDM-E2” on page 103 for a complete description of charging
the EAGLE 2.
WARNING:
Do not plug the charger cable into a battery pack that contains alkaline
batteries. Do not attempt to charge alkaline batteries.
7.
When a connection has been established between the SDM Docking Station
PC Controller Program and all of the SDM-E2s, the main program window will
appear as shown below.
Figure 28: SDM-E2 Connection
8.
Connect the gas out to EAGLE 2 line of each SDM-E2 to the inlet of each
EAGLE 2.
- Eagle Series (89 pages)
- Eagle Series (66 pages)
- 01 Series Manual (33 pages)
- 01 Series Quik Start (2 pages)
- OX-94 (13 pages)
- FP-3 (16 pages)
- GasWatch 1 (18 pages)
- GasWatch 2 Manual (37 pages)
- GasWatch 2 Quik Start (2 pages)
- GP-01 (34 pages)
- GP-01 with self resetting alarms (33 pages)
- GP-204 (7 pages)
- NP-204 (13 pages)
- RI-215A (24 pages)
- SC-01 (45 pages)
- SC-01 (68 pages)
- Data Cal 2000 (88 pages)
- EAGLE 2 Manual (309 pages)
- Eagle 2 Quik Start (2 pages)
- GX-94 (3 pages)
- GX-94 (52 pages)
- SDM-E2 (89 pages)
- Eagle 1 Manual (89 pages)
- Eagle 1 Quik Start (2 pages)
- Inert Gas Testing Eagle with Two Pumps (66 pages)
- Gas Tracer (234 pages)
- Gas Tracer 10,000 ppm (120 pages)
- GX-2001 Manual (45 pages)
- GX-2001 Quik Start (2 pages)
- GX-2001 Canadian Version (43 pages)
- GX-2003 Manual (94 pages)
- GX-2003 Quik Start (2 pages)
- GX-2009 Manual (73 pages)
- GX-2009 Quik Start (2 pages)
- GX-2009 Supplement (2 pages)
- GX-2012 Manual (185 pages)
- GX-82 (22 pages)
- GX-82A (43 pages)
- GX-86 (22 pages)
- GX-86A (39 pages)
- GX-8000(PT0-098) (52 pages)
- GX-8000(H4-0050) (23 pages)
- RX-516 (36 pages)
- GX-2009 (54 pages)