If applicable perform the following:

■ Apply commercial power to the internal battery charger

receptacle (to ensure good starting) via commercial power.
An external power cord will be required. This capability is an

option

.

■ Apply commercial power to the jacket water heater

receptacle (not necessary for warm climates) via commercial
power. An external power cord will be required. This capability
is an

option

.

DCA-600SSV — GEN. START-UP PROCEDURE (MANUAL)

Figure 43. Load Connections

BEFORE STARTING

6. Close all engine enclosure doors (Figure 44).

Figure 44. Engine Enclosure Doors

3. Place the

G.F.C.I. and aux. circuit breakers (Figure 42) in the

OFF” position prior to starting the engine.

4. Connect the load to the

UVWO terminals or auxiliary

receptacles as shown in Figure 43. These load
connection points can be found on the output terminal
panel. To gain access to the UVWO terminals or other
power receptacles, unlock the access cover and lift the
door.

5. Tighten the UVWO terminal nuts securely to prevent

load wires from slipping out.

Generator and Control Panel

The engine's exhaust contains harmful emissions.
ALWAYS have adequate ventilation when operating.
Direct exhaust away from nearby personnel.

CAUTION - LETHAL EXHAUST HAZARD

NEVER! manually start the engine with the main, GFCI
or

auxiliary circuit breakers in the ON (closed) position.

WARNING - STARTING THE GENERATOR

INCORRECT

CORRECT

1. Press the

main circuit breaker “OFF” switch (Figure 40).

2. Verify that the

main circuit breaker “OFF” lamp (Figure 41)

is lit (ON).

Figure 40. Main Circuit Breaker OFF Switch

Figure 42. GFCI and Auxiliary

Circuit Breakers (OFF)

Figure 41. Main Circuit Breaker OFF Lamp