beautypg.com

Wrs-5200 — machine start-up and operation – Multiquip WRS5200 User Manual

Page 24

background image

PAGE 24 — WRS 5200 RIDE-ON ROLLER SCREED — PARTS MANUAL — REV. #2 (08/09/02)

WRS-5200 — MACHINE START-UP AND OPERATION

A.

START-UP

The following steps are intended as a basic guide to ma-
chine start-up and operation. Following these procedures
will help preserve and maintain the life of this equipment.

⇒ Check oil levels in engine and hydraulic reservoir.

⇒ Check to make sure there is a full tank of fuel before

starting.

⇒ On the power unit, put the screed operation valve lever

in the “Screed Operation” position.

⇒ Put the two drive tube direction control levers shown in

Figure 12 in the “Middle” position.

⇒ Adjust the drive tube speed control lever shown in Fig-

ure 12 to the “Straight Up” position.

⇒ Put throttle switch in “Low,” the “Kill Switch” in the “Up”

position, and depress the “Choke Switch”, if necessary,
while turning the key.

⇒ While sitting in the seat, turn the key and start the en-

gine.

⇒ Once the engine is warm, put the toggle switch on throttle

control to the “High” position to begin operation.

B.

CLEANUP

Never allow any concrete to harden on the roller screed.

Immediately after use, wash any concrete off the screed.
Be careful not to spray water on the engine while it is still
hot.

To operate the pressure washer, attach a garden hose to the
pump and turn on the water. Next plug in the quick connect
hoses from the pressure washer to the power unit, adjust
the three way valve on the power unit as indicated by the
decal to the “Pressure Washer” position.

“Clean out” plates for the ends of the center strike tubes
(8’and 16’ tubes) should be removed and the ends cleaned
after each use.

Back off the 1-5/8 nut and jam nut on the outside strike
tubes next to the outer plate. Slide the strike tube away
from the middle bracket and clean the ends.

The solid scraper bars that prevent build-up on the drive
tubes should be removed and cleaned as well as the strike
tube wipers mounted in front of the 5 foot sections.