beautypg.com

MTS Criterion 60 - Installation and Commissioning Plan User Manual

Page 9

background image

Installation and Commissioning Plan

8 Criterion

TM

Series 60

INTRODUCTION

This Introduction provides a brief overview of the supplied equipment. It is not
intended as a substitute for formal training. MTS strongly recommends formal
classroom training at the MTS facility in hardware and software operation and
maintenance.

A4.0 System Introduction

Item Description

Performed

On Site

A4.1

System components:

-

System Start-up and shut down.

-

Emergency and safety features - Emergency Stop,

crosshead limits, test area enclosure, and location
of circuit breakers/fuses.

-

Connecting transducer, which includes methods of

safe handling, selecting capacity for proper
application, and calibrating.

-

Login into TestWorks



A4.2

Using TestWorks, the basics.

-

Accessing and using the Help System.

-

Set up user login names & manage the data.

-

Configure the user interface such as the

appearance of meters, graphs, and sash positions.

-

Setting up additional transducers within the

TestWorks software.