C1.0 on-site calibrations (purchased option) – MTS Criterion 60 - Installation and Commissioning Plan User Manual
Page 12

Installation and Commissioning Plan
Criterion
TM
Series 60 11
PURCHASED OPTIONS: (Extends normal installation
plan based on the number of options purchased)
C1.0 ON-SITE CALIBRATIONS (purchased option)
Item Description
Performed
On Site
C1.1
Perform on-site system calibration of Load,
Displacement, Speed, Extensometers or other accessories
and/or transducers.
C2.0 SYSTEM PERFORMANCE DEMONSTRATION
(purchased option)
If you purchased an option to have MTS perform demonstrations on the installed
system that are in addition to the installation tasks described in paragraphs A2.0
and A3.0 see note below. For installation, demonstration, and training, the
customer will provide suitable specimens and other materials (for example, CO
2
,
liquid N
2
, temperature scanner, etc.) for the type of grips and system purchased.
Item Description
Performed
On Site
C2.1 Demonstrate
system
performance of purchased option(s).
These demonstrations can include:
-
Verification of published or quoted MTS
performance specifications (see note below).
-
Verification of customer performance, accuracy or
endurance specifications (see note below).
-
Performance of particular materials tests (see note
below).
Note: The request for quotation including specifications or performance to be
demonstrated, and clearly defined pass-fail criteria, and the MTS
proposal is attached for reference.