Installation and Commissioning Plan

Criterion

TM

Series 60 9

FINAL CONFIGURATION & TRAINING

B1.0 Final Functional Checks & Configuration

Item Description

Performed

On Site

B1.1

Create backup of all critical files.

B1.2

Create up to three basic methods according to user-

defined specifications. Basic methods are created from a
standard compression, tensile, or peel method template.
Refer to section A1.5 for definitions of method
modifications.

B1.3

Verify methods are working and the results are

acceptable / calculated correctly.

B1.4

Clean up/organize the system workspace. Tie-wrap loose

cables, close machine panels, etc.



B1.5 For computers purchased through MTS, complete the

warranty registration

