C43 (30 kN, 50 kN) and C44 double-column MTS Criterion load frames should
only be moved using a forklift (or crane) with a load rating that is double the load
frame’s gross weight. For frame weights, see
The MTS Criterion frames are heavy.
Moving the frame using improper procedures can injure personnel (for
example, strained muscles and back injuries) or damage the frame.
Moving and positioning the MTS Criterion frame must be performed by
personnel trained in moving large equipment.
Before you begin
Before moving the load frame, ensure that:
•
Your equipment operators have the appropriate licenses and have complied
with your local safety standards (for example, the appropriate training
required by OSHA in the U.S.).
•
At the final site location, there is adequate clearance between the ceiling and
the top of the load frame, including clearance for lifting the frame via a
forklift or crane.
•
There are no loose accessories on the shipping skid.
•
The frame and forklift (or crane) can fit through all doorways, halls,
elevators, or stairs located from the shipping dock to the final site location.
•
The floors from the shipping dock to the final site location have sufficient
support for the weight of the load frame and forklift (or crane) combined.
•
You have adequate packaging materials to protect the load frame when
moving or relocating it to another site.
Equipment
The following items are required by the customer:
•
A forklift or crane with a load rating that is double the load frame’s gross
weight (for frame weights, see
“Load Frame Dimensions and Weights”
•
Protective padding for the crosshead
•
Screw removal tool
•
Safety line or safety belt
•
Two M16 hoist rings if using a crane
Righting the package
from a prone position
The C43.504 and C44 frames have been shipped in a horizontal position; they
must be moved into an upright, standing position before unpacking.
WARNING