beautypg.com

Procedure – MTS Criterion 40 - Lifting and Moving Instructions User Manual

Page 11

background image

Moving C42 Single-Column Frames

MTS Criterion

®

Series 40 Lifting and Moving Instructions

11

Procedure

To unpack and position the load frame:

1. Move the load frame, still in the shipping material, to its final location

within your building. Use a forklift to transport the container from the
shipping dock to the final location. Unpack the load frame after it has been
moved to its final location.

2. Remove the shipping material, leaving the load frame fastened to the

shipping skid.

3. Remove the shrink wrap vapor barrier encasing the load frame.

4. Cut the strapping that secures the load frame to the shipping skid.

5. Remove the fixed wood blocks around the machine.

6. Use the packing list to inventory all the items. Accessories may be in the

container with the load frame or may be packaged separately.

Do not open any of the packing boxes. The packing list will indicate the
total number of boxes that are included in the shipment. Count the number
of boxes you received to make sure you have the correct number of boxes.
Do not open these boxes until the MTS service representative arrives to
install your testing system. This ensures that no parts are lost prior to
installation.

7. Mount the M16 hoist ring to the top beam of the frame column.

8. Use the crane to slowly and carefully lift the frame clear of the wooden

pallet, and place it in its operating position.

9. Retain all packing materials until the system is satisfactorily installed and all

parts, assemblies, and accessories have been located.

When the frame is in its operating location, you can proceed with the installation
process.