beautypg.com

MTS Landmark Floor Standing User Manual

Page 97

background image

Preloader Collar Bolts

Description

Item

Remove one at a time

1

G-n Paste

2

6. Align the force transducer to the crosshead:

a) Lightly tap the transducer with the rubber mallet to change its position until you get a TIR of 0.038 mm

(0.0015 in) or less.

b) Tighten to 5% of the torque recorded on the identification plate.

Hex nut—Tighten the nut to 5% of the final torque shown on the identification plate.

Preloader collar—Tighten the jackbolts or setscrews to 5% of the final torque shown on the identification
plate.

c) Rotate the indicator to see if the TIR is still 0.038 mm (0.0015 in) or less. If not, loosen the nut or

preloader collar and return to Step 4. (Loosen the preloader collar using the following sequence.)

MTS Landmark™ Floor Standing Load Units Product Information 97

Maintenance

This manual is related to the following products: