MTS Landmark Floor Standing User Manual
Page 41
•
If your load unit has isolation pads, and the load unit does not sit level, install stock metal shims between
the pads and the floor.
•
If your load unit has airmounts, inflate each airmount in 5 mm (0.20 in) increments to level the load
unit.
•
Check the airmounts’ pressures often to ensure that they do not exceed 0.55 MPa (80 psi).
•
Check the airmounts’ inflated heights to ensure that they are all between 83 and 88 mm (3.25 and
3.5 in).
•
Adjust the air pressure to level the load unit.
Warning:
Airmounts can be overinflated and then explode.
You can be seriously hurt if an airmount explodes, sending fragments flying.
Only inflate airmounts that have the full weight of the load unit resting on them. Never
inflate an airmount above 0.55 MPa (80 psi). Check airmount pressures with an accurate
pressure gage.
Each airmount's inflated height—measured from the floor to the bottom of the load unit’s
leg—should be 83–89 mm (3.25–3.5 in).
Isolation Pad or Airmount Adjustment
Description
Item
Airmount Foot Support
1
Isolation Pads
2
Load Unit
3
83-89 mm (3.25–3.5 in)
4
0.55 MPa (80 psi)
5
Install shims to level.
6
MTS Landmark™ Floor Standing Load Units Product Information 41
Installation