Installation, Load unit configuration, Installation 25 – MTS Series 242 Actuators User Manual
Page 25: Load unit configuration 25

Load Unit Configuration
Series 242 Actuator Product Information
Installation
25
Installation
Installing the Series 242 Actuator depends on the testing application.
•
For materials or component testing, the actuator is typically installed in a
load frame configuration or test fixture. For more information, see the
following load unit configuration topic.
•
For structural or vibration testing, the actuator is typically secured to a
reaction mass using a swivel or pedestal base. This section describes how to
install the actuator for this type of configuration.
Contents
Installing a Fixture to the Actuator 26
Connecting Hydraulics-242 Actuator 30
Load Unit Configuration
When a Series 242 Actuator is mounted in a load frame configuration, the
actuator is installed on the crosshead of a tabletop load frame at the factory.
Actuator options such as servovalves and manifolds are also installed on the
actuator at the factory. The only installation required is to connect system
hydraulic hoses and system cables.