MK Diamond MK-1590 User Manual
Page 15

15
TRACK RAIL SAW
SET-UP
1. Position Saw Assembly (A) on the slab. The inner side of the blade is approximately 6.25 inches
from the top edge of the aluminum rail.
2. Slide the Material Clamps from both ends of the Rail Assembly until the Clamp Foot (B) is
underneath the slab.
3. Tighten screws (C) until the Saw Assembly is secured to the slab without any side movement.
4. To realign the Rail Assembly, slightly loosen the Material Clamps. Realign the Rail Assembly by
tapping the ends of the Rail Assembly.
5. Repeat Steps 3 and 4 if realignment is necessary.
A
C
B
WARNING
Ensure that the electrical cord is not connected before assembling and aligning material clamps.
Material Clamps & Alignment
See also other documents in the category MK Diamond Power saws:
- MK-770 (41 pages)
- MK-770 EXP (46 pages)
- MK-660 (44 pages)
- MK-470 (12 pages)
- MK-377 (36 pages)
- MK-370 (36 pages)
- MK-370 EXP (52 pages)
- MK-170 (36 pages)
- MK-145 (32 pages)
- MK-145 220 Volt (32 pages)
- MK-101 (52 pages)
- MK-101 (56 pages)
- MK-101-24 (52 pages)
- MK-101-24 (56 pages)
- MK-101 Pro / Pro24 (56 pages)
- MK-101 Tracker (45 pages)
- MK-101Pro24 JCS (60 pages)
- MK-101 JCS Rental (51 pages)
- MK-101 Lowes (56 pages)
- MK-101 Lowes (52 pages)
- MK-100 (44 pages)
- MK-100 (52 pages)
- MK-100 Tracker (46 pages)
- MK-100 JCS (49 pages)
- TX-3 (52 pages)
- Saw Tent (2 pages)
- MK-112 (28 pages)
- MK-1070 (22 pages)
- MK-212 (52 pages)
- MKDX Profile Milling Machine (40 pages)
- MK-EZ Profile Milling Machine (36 pages)
- MK-1503SS (24 pages)
- MK-1080 (44 pages)
- MK-1080 (1 page)
- MK-1080 (3 pages)
- MK-1280 Gas Saw (48 pages)
- MK-1280 Electric Saw (40 pages)
- MK-1280 Rolling Cart (4 pages)
- MK-1270 (Shindaiwa) (28 pages)
- MK-2000 Electric Saws (52 pages)
- MK-2000 Gas (60 pages)
- MK-5005S (56 pages)
- MK-5000 Gas Saws (56 pages)
- BX-3 (36 pages)