beautypg.com

Snap-loc 24 – Metal Sales Snap-Loc 24 Manual User Manual

Page 13

background image

PSN-13

SNAP-LOC 24

®

© Metal Sales Manufacturing Corporation/ Subject to change without notice/ Effective Date 9/11

800.406.7387 (Corporate Office) • www.metalsales.us.com

d

esign

/ i

nsTallaTion

C

onsideraTions

(

ConT

)

Panel Endlapping - If panel endlapping is required, endlaps are to be applied in one continuous line. This allows the cinch straps

to complete full coverage of the Snap-Loc 24 Panel.

OPTIONAL PANEL:

Optional when endlapping panels

Used as both the eave and peak panel

Both ends factory notched and punched

STANDARD PANEL:

Standard if endlapping of panels is not required

No punching

No notching

Optional Panels

Notched/Punched

Eave

Factory Notched / Punched Panels - Unless otherwise specified, Metal Sales provides all Snap-Loc 24 panels with no factory rib

notching or fastener hole punching. Panels that are to be factory notched/punched must be specified at time of order.

Eave Panel

Peak Panel

Panel Lap

Endlap Purlin

Panel Installation Sequence

1

2

4

6

8

3

5

7

Peak