Panel Endlapping - If panel endlapping is required, endlaps are to be applied in one continuous line. This allows the cinch straps
to complete full coverage of the Snap-Loc 24 Panel.
OPTIONAL PANEL:
Optional when endlapping panels
Used as both the eave and peak panel
Both ends factory notched and punched
STANDARD PANEL:
Standard if endlapping of panels is not required
No punching
No notching
Optional Panels
Notched/Punched
Eave
Factory Notched / Punched Panels - Unless otherwise specified, Metal Sales provides all Snap-Loc 24 panels with no factory rib
notching or fastener hole punching. Panels that are to be factory notched/punched must be specified at time of order.
Eave Panel
Peak Panel
Panel Lap
Endlap Purlin
Panel Installation Sequence