beautypg.com

Start up & operation – Kifco T40x1320 - Two Axle 380,601 - Present Operator Manual User Manual

Page 17

background image

P/N 19302460

Copyright © April 2012 by Kifco

®

Inc.

Start Up & Operation

Step-by Step Operation Continued

9. Verify that the coils of tube remaining

on the drum are both coiled and packed
tightly (photo). If they are not use the
hand crank and PTO input on the gear-
box to tighten them.

10. Adjust sprinkler cart to the desired

width. See “Specification Section”.

11. Attach supply hose. Verify there are no

kinks or twists in the supply hose.

12. Lower the anti reverse pawl prior to

engaging the drive system.

13. Engage the Gearbox

Turbine Drive: Engage the gearbox by turning the left handle counter clockwise 1/8

th

of a turn

Engine Drive:

Push Left gearbox handle to engage.

14. Reset gearbox gear selection by firmly pulling the disengage rod away from the gearbox and select fast or

slow gear by turning the right had gearbox handle. If the handle does not turn, rotate the gearbox pulley
slightly.

Reset Handle (Attached

to Disengage Rod)

14