Preparations – JULABO SW23 Shaking Water Baths User Manual
Page 16

Preparations
16
5. Preparations
5.1. Installation
Caution:
The unit is not for use in explosive environment.
>80 mm
17
15
18
The installation site should meet the following conditions:
1. The base of the installation site should be level to ensure
proper functioning of the safety features.
2. The laboratory table, for example, should be sturdy
enough, to where the shaking frequency cannot cause
vibration of the table. Consider that the masses moved
may be in the order of several kg.
Keep a wall distance of minimum 80 mm.
Do not cover the ventilation openings on the floor and
rear side of the bath.
Installing and removing the shaking carriage:
Holding screw (17) can be removed without the use of
tools. Retain plastic washers (18) on both sides of the
push rod.
The shaking carriage can be completely removed.
Samples can be added to the carrier trays while outside
of the bath.
Then put the shaking carriage back into place. Use the
holding screw and plastic washers (18) to screw the
push rod onto the shaking carriage (15).
Tighten the holding screw securely.
Caution:
The shaking frequency may cause a laboratory table to oscillate.
At operation, the vibration may cause items on the table top to fall off under
extreme unfavourable circumstances.
Carefully choose the setup location.
Shaking frequency is adjustable. After readjusting shaking frequency,
always observe other objects near the shaking water bath and remove them
to a different location if necessary.