Installation – JULABO HT30-M1 High Temperature Circulator User Manual
Page 23

HT30-M1
23
5.2. Installation
Caution:
Installation of the C.U.-unit / Installation of the magnetic valve
• Always turn off the unit and disconnect the mains cable (38) from the power source
before installing the unit.
• The control cable with plug (56) of the C.U.-cooling unit or the magnetic valve always
have to be connected or disconnected in absence of current.
Control of the C.U.-cooling unit or the magnetic valve.
• With the C.U.-cooling unit or the magnetic valve the menupoint
–CoolingMax- has to be adjusted to a value of > 0 (Recommendation: 100%). So the
automatical control of the cooling can become active
(see 8.6. Limits).
Installation of the C.U.-unit
JULABO Order-No.
9790100
C.U. cooling unit
44
45
56
52
60
62
61
64
63
K11
K14
56a
• Use the leader pins (62) to fix
the assembly sheet (60) into the
base (61) of the circulator and
fasten with hexagon screws
(63).
• Push the C.U.-cooling unit to the
circulator and screw it tightly at
the points (64).
• Connect the cooling circulation
for the oil (52, 53) (open end
wrench SW19). When doing this
hold the tube at position K11
with an open end wrench SW21.
• Connect the cooling water (44, 45) (open end wrench SW15)
When doing this hold the tube at position (K14) with an open end
wrench (SW14)
• Fix the control cable (56) at the control exit (56a) and screw it tightly.
Cooling capacity at 2 l/min flow of cooling water.
Temperature
[°C] 350
250
150
75
Cooling capacity
[kW]
12
8
4
1