beautypg.com

Pre-startup checklist, Startup – Despatch LAD Series WITH PROTOCOL PLUS User Manual

Page 19

background image

11

Pre-Startup Checklist

Know the system. Read this manual carefully. Make use of its

instructions and explanations. Safe, continuous, satisfactory, trouble-free
operation depends primarily on the degree of your understanding of the
system and your willingness to keep all parts in proper operating
condition.

Check line voltage. Voltage must correspond to nameplate requirements

of motors and controls. Refer to the section on power connections in the
INTRODUCTION of this manual.

Fresh air and exhaust. Do not be careless about restrictions in and

around the fresh air and exhaust openings and stacks. Under no
condition permit them to become so filled with dirt that they appreciably
reduce the air quantity. The proper ventilation clearances should be
fulfilled at all times. Refer to the Set-up instructions in this manual.

Helpful hints

For drying ovens, open vent to prevent buildup of moisture.

For sample heating, close the vent when no ventilation is required.


Startup


For fastest oven heat-up time, close the fresh-air vent. After the desired temperature is
reached, the vent may be adjusted as needed.

1.

Start Fan.

a.

Open oven door.

b.

Press Power switch to the On position. You will hear the exhaust and
recirculating fans start.

c.

Shut oven door.

d.

Check that the control display turns on.


2.

Operate the temperature control as desired by following the control operation
instructions that follow.