Assembly & installation – Danuser 2312 AugerBucket User Manual
Page 9

9
STEP 7: Activate the vehicle’s auxiliary hydraulics to ensure the auger rotates toward the
discharge end.
STEP 8: Check the hydraulic system for leaks.
STEP 9: Install the chute(s) to the discharge end of the Auger Bucket. If you are using
more than 8’ of discharge chutes, then we recommend you weld a hook to the
bucket and another half way down the chutes. Then install a support chain.
Never check pressurized system for leaks with your bare
hand. wear proper hand and eye protection and use wood
or cardboard when searching for suspected leaks. Oil
escaping from pinhole leaks under pressure can penetrate
skin and create a serious medical emergency. if any fluid
is injected into the skin, gangrene, blood poisoning, even
death may result. Obtain medical attention immediately.
Remember hydraulic systems are under pressure whenever
the engine is running and may hold pressure after
shutdown. Before connecting or disconnecting hydraulic
hoses, be sure to relieve all pressure by cycling all
hydraulic controls after shutdown.
w A R N i N G
For ease of cleaning, coat the bucket with a water based releasing agent.
NOTE
C A U T i O N
Do not coat the bucket with a petroleum based cleaning
agent. Damage to rubber components will occur.
w A R N i N G
Assembly &
installation
(continued)