Checkout procedure — before starting the burner, Before firing the burner, Checklist before firing – Carlin 702G/O Inst Manual User Manual
Page 18

Model 702G/O Advanced gas/oil burners — Instruction manual
Carlin part number MN702GO Rev. 06/23/14
– 18 –
Where appliance instructions differ from this manual, follow the appliance instructions.
6. Checkout procedure — before starting the burner
Before firing the burner . . .
Should overheating or an emergency occur, immediately
do the following:
• Shut off oil supply line and gas supply valves.
• Under some circumstances power should remain
on	for	water	pumps	or	blowers.	Determine	proper	
response	before	attempting	start-up.
• If burner fails ignition on several attempts, use burner
blower to purge appliance chamber before restart.
Checklist before firing . . .
❏
Burner	and	appliance	installed	per	this	manual	and	appliance	
instruction	manual?
❏
Burner/appliance installed per all applicable codes?
❏
Installation	site	has	adequate	combustion/ventilation	air	openings	
and	vent	system?
❏
Are	voltages	correct?	Burner,	appliance	and	motor	correctly	wired	
per	burner	and	appliance	manuals	and	wiring	diagrams?
❏
Gas	manifold	spud	orifices	(on	gas	manifold,	item	29,	page	5)	sealed	
with	pipe	dope	and	tight?
❏
Burner	nozzle	verified	per	appliance	manufacturer’s	instructions,	
Carlin	OEM	Spec	Guide	or	Table	1,	page	4?
❏
Gas	and	oil	supply	lines	in	good	condition,	sized	and	designed	
correctly?
❏
Gas and oil line connections and fittings tight?
❏
Oil	tank	has	oil,	and	oil	line	valves	are	open.	Oil	supply	and	return	
lines	purged?
❏
Burner,	appliance	and	all	components	inspected	and	in	good	
condition?
❏
Appliance	limit	and	operating	controls	properly	installed,	wired	and	
adjusted?	
❏
Boiler	water	supply,	feed	pumps,	automatic	feeders,	and	low	water	
cut-offs	properly	piped	and	wired?
❏
Breeching,	draft	regulator,	draft	inducer	(if	required)	properly	in-
stalled	and	operational?
❏
Gas	train	piping	and	components	correctly	installed,	tested	and	
verified	gas	tight?
❏
Vent lines installed when required?
❏
Gas lines purged?
❏
Sufficient gas line pressure present?
