Installation procedure, Tools required and pre installation procedures, Pre installation procedures – BASELINE Lift BL211CF User Manual
Page 9
9
TOOLS REQUIRED and PRE INSTALLATION PROCEDURES
Tools Required: Gather all the tools listed below.
4” x 4” Wooden Blocks (for unpacking)
16ft. Measuring Tape
Chalk Line and Chalk
Side Cutters
Crow Bar
Metric Wrenches and Ratchet Set
SAE Wrenches and Ratchet Set
Metric and SAE Allen Key Sets
Hammer
Screwdrivers
Step Ladder
4 ft. Level
Rotary Hammer Drill with 3/4” diameter Masonry Drill Bit
Pre Installation Procedures
Before proceeding with installation, read the installation manual and insure all instructions are
fully understood and all component parts are accounted for.
1. In the installation area, identify the center line of the bay and mark the floor. Also mark the
center of bay entrance door. Connect these two points with a short chalk line in the area
where lift will be located. Draw a second chalk line at 90° to locate the positions of both lift
columns. Insure each lift column is equal distance from bay centerline and each baseplate
maintains a minimum distance of 6 inches from any floor seam. Do not install if floor
has cracks or deterioration that could affect lift stability. The shop owner is responsible for
confirming there are no obstructions in the installation area like floor drains, under floor
piping or electrical conduit that could be damaged or prevent safe lift installation and secure
lift anchoring. Check ceiling for beams or heating ducts and walls for protruding structures,
etc. Confirm that the overall height you intend to install will fit in the bay. Insure the lift can
be safely installed in the position you have marked out on the bay floor.
2. Place the lift on wooden blocks so that the steel shipping frames can be removed.
3. Remove protective wrapping. Clear installation area of all packaging materials.
4. Unbolt steel shipping frames and remove from installation area.
5. Carefully remove top column and lay on the floor (carriage side up).
6. Carefully remove arms and hardware box from the lower column.
7. Identify powerpack column. Move (carriage side up) to appropriate location placing the
baseplate end on your floor marks. Similarly, move the second column to the opposite
location.