4. Hardware Installation
Step1: Connect to Power
Prepare suitable DC 9~30V power source and connected to EH switch by 3-pin
Terminal blocks.
You can connected two DC input for power auto-backup need.
Check P1/P2 LED for correct power source, everything is OK if the LED(s) was
lighted
Step2: Connect to Network Device by Ethernet
Connected your device by standard UTP/STP cable with RJ-45 connectors to EH
switch.
The LINK LED will be lighted if the Ethernet connection was linked.
It is indicated and blinked if data was transfer by EH switch hub.
UL Notice for Power supplier
All the series of EH products are intended to be supplied by a Listed Power Unit
marked with ¡LPS¡, ¡Limited Power Source¡ or ¡Class 2¡ and output rate 9-30VDC,
0.6A. Or, use the recommended power supply in ¡Optional Accessories.
5. LED Indicators
There are four LED indicators located at the front panel of EH series.
Name
LED
Status
Description
Off
Both P1 and P2 on or off
ALM
Green
On
Either P1 or P2 on
Off
Power input 1/2 is not plugged yet
P1/P2 Green
On
Power status is Ready
Off
Link is Boren or Cable not be plugged
Green
Blink
Traffic be indicted for data transfer
Off
10M rate be active
RJ45
Yellow
On
100M rate be active
Off
No data be transmitted
Data
Blink
Working when data transmitted
Off
No media be available
Fiber
SC/ST
Link
On
Working when media was ready
7. Configuration and Setting Methods