beautypg.com

3 power supply backup – 2N NetStar Hardware manual User Manual

Page 49

background image

49

3.3 Power supply backup

For the backup of the power supply in case of power shortage an on-line UPS appliance
is  used.  The  UPS  is  to  be  connected  pursuant  to  the  documentation  supplied  for  the
separate types and producers.

The following chart will help you to design an optimal UPS performance. 

The  values  stated  in  the  unconducting  chart  serve  for  information  only,  the

consumption  and  the  performance  of  the 

 

  system  change  according  to

2N

®

NetStar

the current operational system load and the HW configuration of the separate modules.

UPS - 800W / 1000VA

Number of cases

1

2

3

4

5

Backup time

150 min

70 min

50 min

-

-

UPS - 1600W / 2200VA

Number of cases

1

2

3

4

5

Backup time

240 min

150 min

100 min

70 min

50 min

 

NSVL8 , NSCOVL FXS - MINIMUM SERIAL RESISTOR <=
20 OHM

Table 1: NSVL8 , NSCOVL - FXS