JLG G12-55A Operator Manual User Manual
Page 88

Section 5 - Attachments
5-14
3126018
Before S/N 0160037689
This installation procedure is designed for one-person operation. Prior to exiting cab,
perform “Shut-Down Procedure” on page 4-5.
1. Tilt quick switch back to provide clearance. Check
to be sure lock pin is secured in out position with
retainer pin.
2. Align attachment pin with recess in attachment.
Raise boom slightly to engage attachment pin in
recess.
3. Tilt quick switch forward to engage attachment.
4. Remove retainer pin and slide lock pin in fully.
Secure lock pin in locked position using retainer
pin.
5. If equipped, swing attachment saddles down and
pin in place.
6. If equipped, connect auxiliary hydraulic hoses. See “Hydraulic Operated
7. If equipped, connect auxiliary electric harness.
OY1840
OY1850
OY1860
OY1860
OY0601