16 rug carrier accessory (dvsp - option), General, Pre-start inspection – JLG DVSP Series Operator Manual User Manual
Page 45: Hanging a rug using the rug carrier accessory arms, 16 rug carrier accessory (dvsp - option) -25, General -25

SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION
3121135
– JLG Lift –
3-25
3.16 RUG CARRIER ACCESSORY
(DVSP - OPTION)
NOTE: The Rug Carrier accessory is available only on the
JLG DVSP model and is not authorized for use with
any other JLG lift. The Rug Carrier Accessory is
intended for use in hanging and removal of rugs in
hanging display racks only. Use for any other pur-
pose is not authorized by JLG.
General
The Rug Carrier Accessory consists of two pivoting arms
mounted to the DVSP platform left side rails. The pivoting
arms are locked in the plane of the platform side rail when
not in use (the stowed position). The arms are locked into
position at approximately 90 degrees to the left side plat-
form side rails when in use (the carry position). The pivot-
ing arms’ position can be changed by lifting each arm to
release the lock, rotating the arm, and lowering each arm
back into a locked position.
Pre-Start Inspection
Prior to use of the Rug Carrier accessory, check the fol-
lowing;
• Carrier arm mounting is secure to the platform railing,
no missing or damaged fasteners.
• The arm lock pins are in place and working properly.
Hanging a Rug using the Rug Carrier Accessory
Arms
The following is a description for use of the Rug Carrier
accessory in hanging rugs on horizontal pivoting arm dis-
play racks.
1. Select the intended location in the display for mounting
the rug. Open the display rack to provide adequate
space for the DVSP lift and rug.
2. With the Rug Carrier Accessory arms stowed, drive the
DVSP into position prior to loading the rug.
3. Swing and lock Rug Carrier Accessory arms into the
carry position.
4. Load the rolled rug with the finished side facing the
platform. As required, use an assistant to load the rug
onto the Rug Carrier Accessory arms.
5. Make sure that the rug is centered over its length on
the Rug Carrier Accessory.
6. Elevate the platform to the required height for mount-
ing the rug onto the display arm.
7. Properly attach the rug to the display arm. Never climb
onto the platform rails for any reason.
8. After adequately attaching the rug to the display arm,
lower the platform, stow the Rug Carrier Accessory
arms.
9. As required reposition and elevate the DVSP to com-
pletely attach the rug.
Positioning Rug Carrier Arms
1. Carry Position
3. Lift Arm Up, Swing
2. Stowed Position
and Lock into Position
Positioning Carpet Roll On Rug Carrier
1. Center Carpet on Arms
3. Platform Front
2. Rest on Arms Here (a)
Note:
(a) Maximum Capacity of Arms - 150 lb. (68kg)
3
2
1
2
1
3