Pre-operation Inspection

Be sure that the operator’s, safety and

responsibilities manuals are complete, legible
and in the storage container located in the
platform.

Be sure that all decals are legible and in place.

See Decals section.

Check for hydraulic oil leaks and proper oil

level. Add oil if needed. See Maintenance
section.

Check for battery fluid leaks and proper fluid

level. Add distilled water if needed. See
Maintenance section.

Check the following components or areas for
damage, improperly installed or missing parts
and unauthorized modifications:

Electrical components, wiring and electrical

cables

Hydraulic hoses, fittings, cylinders

Hydraulic tanks

Drive motors

Wear pads

Tires and wheels

Limit switches, alarms

Nuts, bolts and other fasteners

Platform entry gate

Beacon and alarms (if equipped)

Safety arm

Scissor pins and retaining fasteners

Platform control joystick

Check entire machine for:

Cracks in welds or structural components

Dents or damage to machine

Be sure that all structural and other critical

components are present and all associated
fasteners and pins are in place and properly
tightened

Side rails are installed and bolts are

fastened