Synergy 8095-01 - Jeep JK Front Track Bar Brace (RHD) User Manual
Page 9
17) With all hardware started, torque in the following order to the corresponding
torque specifications:
o Pitman Arm Stud - 150 ft-lbs.
o 7/16-14 bolts - 50 ft-lbs (NOTE – We are aware it is difficult to get a
torque wrench on some of these bolts so simply tighten snug using a
standard 6-8” long combo wrench.)
18) With all hardware torqued, it is a good idea at this time to check for adequate
track bar clearance. If running a stock track bar or Synergy 8087 track bar, there
should be no clearance issues. However, if running a different aftermarket track
bar, follow these steps to check for adequate clearance.
o Install the track bar to be used at the frame side and lift the opposing side
as high as possible until contact is made with the frame or with the pitman
arm stud.
o If contact is made with the pitman arm stud well before contact with the
frame, take note of the amount of space between the frame and mounting
hole on the axle end of the track bar. This is the minimum bump stop
requirement needed for the track bar, if using stock mounting point on the
axle.
o If there is any doubt, we advise hooking up the track bar at both ends and
fully bottom out the suspension.