beautypg.com

Synergy 8009-30 - Jeep JK Front Axle Outer Shell Kit User Manual

Page 14

background image

21. Align and weld the lower shock brackets. Break the lower shock brackets apart.

There is a different left and right bracket. When you position them on the axle tube,
they should angle inward at the top so the top of the shocks are closer together than
the bottom. Once you determine the right and left, position them on the axle tube.
The outside edge of the shock brackets should be 1 5/16” (1.31”) from the reference
location on the inner C.


The bottom edge of the shock bracket should be level.