beautypg.com

Synergy 5232-3 - Jeep YJ Rear Cage Kit User Manual

Page 4

background image

8) Space the B-C pillar spreaders approximately 8 ½” apart on the B-pillar main hoop.

9) Once satisfied with C-pillar cross tube and B-C pillar spreaders, go ahead and tack

into place. Once tacked, the C-pillar gussets can be fitted and tacked into place.
They are notched differently L&R and should be placed accordingly. The bottom of
the gusset should be about 18 ½” from the C-pillar base plate.