Vehicle preparation – ARB 3432150 User Manual
Page 5

19-03-08
Page
5
of
21 3783182
VEHICLE PREPARATION
8. Remove the air shield form the vehicle,
and remove the ambient temperature
sender from the air shield.
Short loom .
Longer relay loom .
9. To wire up the indicators from the bull bar
to the vehicle indicators a short loom must
be fitted .
A longer loom with two relays is also to be
fitted in conjunction with the short turn
signal loom .
10. Open the bag containing the long wiring
loom with relays .
Lay the loom across the engine bay from
headlamp to headlamp with the relays on
the Left Hand ( battery ) side of
the vehicle .
Place the relays on the inner guard ( as
shown ) as close as possible to the
battery .
Using a drill and a Phillips head bit attach
the relays to the vehicle with the screws
provided .
Note :- Ensure wiring will not rub on
any metal part or sharp edges .
- RD153 (40 pages)
- RD139 (36 pages)
- RD93 (34 pages)
- RD101 (46 pages)
- RD100 (46 pages)
- RD104 (46 pages)
- RD103 (46 pages)
- RD102 (46 pages)
- RD105 (46 pages)
- RD125 (42 pages)
- RD117 (44 pages)
- RD116 (44 pages)
- RD113 (42 pages)
- RD147 (44 pages)
- RD109 (42 pages)
- RD158 (38 pages)
- RD158 (44 pages)
- RD166 (42 pages)
- RD168 (44 pages)
- RD115 (44 pages)
- RD80 (44 pages)
- RD82 (40 pages)
- RD81 (40 pages)
- RD119 (40 pages)
- RD99 (40 pages)
- RD83 (44 pages)
- RD84 (44 pages)
- RD132 (40 pages)
- RD05 (38 pages)
- RD12 (44 pages)
- RD114 (36 pages)
- RD40 (38 pages)
- RD197 (42 pages)
- RD94 (40 pages)
- RD44 (46 pages)
- RD85 (42 pages)
- RD127 (40 pages)
- RD128 (40 pages)
- RD138 (40 pages)
- RD20 (44 pages)
- RD32 (44 pages)
- RD110 (42 pages)
- RD106 (48 pages)
- RD107 (48 pages)
- RD136 (42 pages)