beautypg.com

Fyr pak operation and maintenance manual – Hale Fyr Pak(2006 to Present) User Manual

Page 14

background image

Fyr Pak
Operation and Maintenance Manual

14

and adjust throttle for desired output.

b)

Alternate Priming Method: If the inlet hose is fitted with a foot valve, the pump may be primed

by jabbing the end of the inlet hose in and out of the water until water expands the discharge

hose. The discharge line MUST be open when this method is used. Be sure the priming valve is

closed before starting engine.

OPERATION STARTING PROCEDURE

WARNING: DO NOT RUN THE ENGINE IN AN ENCLOSED AREA! Exhaust

fumes contain carbon monoxide which is an odorless and poisonous gas. Be

sure the area is well ventilated.

1. Make sure there is a

FRESH mixture of gasoline and oil in the tank. Refer to “Fuel Specifications,” for proper

amounts and type.

2. Connect fuel caddie to fuel line connector on engine base. Squeeze and release the priming bulb until

resistance is felt, indicating the fuel line is full. Further action will pump fuel past the check valve into the
carburetor, flooding it.

3. Close Choke
4. Open throttle slightly (1/4). Closed is down
5. Move ignition switch to “ON” position
6. Place foot on frame to prevent movement
7. Pull the starting handle slowly to bleed off some compression, then pull with a quick short stroke. Repeat as

necessary.

8. When engine starts, slowly open choke
9. Slowly open discharge valve
10. Set throttle to desired operating point.

NOTE:

When operating from draft, especially on high lifts, do not increase engine speed

without a corresponding increase in pump pressure. If the engine speed increases with

no further increase in flow or pressure, reduce the throttle setting until the pressure or

flow decreases slightly and operate at that point.

WARNING: Do not change or fill fuel while the engine running. Fill fuel tank out-of-

doors and away from any source of ignition. Wipe up any spills.