Fyr pak operation and maintenance manual – Hale Fyr Pak(2006 to Present) User Manual
Page 13
![background image](/manuals/545158/13/background.png)
Fyr Pak
Operation and Maintenance Manual
13
TRANSPORTING WARNING
Before transporting the FYR PAK, the fuel caddie MUST be disconnected from the engine and
the fuel drained as instructed under “STOPPING PROCEDURE” . Also, allow engine to cool.
The FYR PAK has a handle for moving and positioning the unit. Care should be taken not to drop or strike the
engine or pump as damage may result.
When transporting the unit by motor vehicle, care should be taken to fasten it down securely. Follow the
manufacturer’s instructions for transporting the fuel caddie.
When carrying the unit as a backpack, the hip belt and shoulder straps should be adjusted to satisfy the
individual.
There are two sets of holes in the frame for adjusting the hip belt.
The top end of the shoulder straps has three positions for attaching to the frame. Position the shoulder straps so
that they are horizontal from the shoulders to the fame. Adjustments are made by moving the adjustment pins on
one of the three holes found in the frame.
INSTALLATION
1. Choose a suitable location, as near to the source of water as possible, to place the FYR PAK and
attach intake and discharge hoses. When operating from draft, the inlet hose should slope continuously down-
ward from the pump to the water.
2. Attach fuel line from remote tank.
CAUTION: Make sure connections on Intake and Discharge hoses match those supplied on the
pump or damage to threads will result. Damage may impede pump performance by allowing
leakage or preventing priming of the pump.
PRIME PUMP
It is recommended that the pump be primed before starting the engine.
a)
Priming Procedure
1. The discharge must be closed either with a discharge valve, shutoff nozzle or by pinching the
discharge hose (use a pinch clamp if available.)
2. Open priming valve
3. Operate priming valve until water is discharged from priming pump
4. Close priming valve
5. Start engine. See starting procedures
6. Slowly open discharge valve until a steady stream is discharged
7. If an unsteady stream is discharged (incomplete prime) open priming valve and operate hand
primer to purge remaining air until a steady stream is discharged. Then, close priming valve