beautypg.com

Installing pump tubing – Bunn Chilled LCC-2 User Manual

Page 9

background image

9

INSTALLING PUMP TUBING

INSTALLING THE PUMP TUBING

Refer to the Tube Replacement Instruction inside the Cabinet door.

1. Loosen the thumbscrew securing the tubing retainer plate to the pump body and set the retainer plate

aside.

2. Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on

the pump band.

3. Apply lubricant (BUNN-O-MATIC part no. M2531.0001) to the middle section of the new pump tubing.

4. Carefully wrap the new tubing around the rotor, making sure that the elbow and clamps end up on the front

side of the pump body.

5. Depress the tension screw and insert it in the notch in the pump body, reapplying spring tension on the pump

band.

6. Install the free end of the tube over the inlet port of the mix chamber on that side of the cabinet.

7. Replace the tubing retainer plate and tighten the thumbscrew.

8. Attach the BIB adapter to the tubing and connect to the opened product container.

9. Repeat steps 1 through 8 for the other pump.

10. Prime the pumps. Refer to Priming the Concentrate Lines section.

Note: Replacement Tube Kits can be purchased from BUNN-O-MATIC.

Remove Retaining Plate

Release Spring Tension

Remove Tubing

Lubricate New Tube

Install New Tubing

Completed Installation

Lubricate between arrows

2.0”

2.0”

Thumbscrew

Tension

Screw

Elbow &

Clamps

Inlet Port

Retaining

Plate

39288 083106