beautypg.com

Bryant Gas Heating/Electric Cooling Units 581B User Manual

Page 40

background image

START-UP CHECKLIST

(Remove and Store in Job File)

I. PRELIMINARY INFORMATION

MODEL NO.:

DATE:

SERIAL NO.:

TECHNICIAN:

II. PRE-START-UP (insert checkmark in box as each item is completed)

Ⅺ VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
Ⅺ REMOVE ALL SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
Ⅺ VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
Ⅺ CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
Ⅺ CHECK GAS PIPING FOR LEAKS
Ⅺ CHECK THAT INDOOR-AIR FILTER IS CLEAN AND IN PLACE
Ⅺ VERIFY THAT UNIT INSTALLATION IS LEVEL
Ⅺ CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW

TIGHTNESS

III. START-UP

ELECTRICAL

SUPPLY VOLTAGE

L1-L2

L2-L3

L3-L1

COMPRESSOR AMPS

L1

L2

L3

INDOOR-FAN AMPS

L1

L2

L3

TEMPERATURES

OUTDOOR-AIR TEMPERATURE

DB

RETURN-AIR TEMPERATURE

DB

WB

COOLING SUPPLY AIR

GAS HEAT SUPPLY AIR

PRESSURES

GAS INLET PRESSURE

IN. WG

GAS MANIFOLD PRESSURE

IN. WG (HI FIRE)

REFRIGERANT SUCTION

PSIG

REFRIGERANT DISCHARGE

PSIG

Ⅺ VERIFY REFRIGERANT CHARGE USING CHARGING TABLES

Ⅺ VERIFY THAT 3-PHASE SCROLL COMPRESSOR ROTATING IN CORRECT DIRECTION

----------------------------------------------------------------------------------------

CUT

ALONG

DOTTED

LINE

CUT

ALONG

DOTTED

LINE

Copyright 1998 Bryant Heating & Cooling Systems

CATALOG NO. 5358-100

CL-1