beautypg.com

Warning, Install flue hood, Install gas piping – Bryant EVOLUTION 577D----A User Manual

Page 11

background image

11

the outlet of the trap is at least 1 in. (25 mm) lower than the
drain--pan condensate connection to prevent the pan from

overflowing. Prime the trap with water. When using a gravel apron,
make sure it slopes away from the unit.
If the installation requires draining the condensate water away from

the unit, install a field--supplied 2--in. (51 mm) trap at the
condensate connection to ensure proper drainage. Condensate trap

is available as an accessory or is field--supplied. Make sure that the
outlet of the trap is at least 1 in. (25 mm) lower than the unit

drain--pan condensate connection to prevent the pan from

overflowing. Connect a drain tube using a minimum of
field--supplied 3/4 --in. PVC or field--supplied 3/4 --in. copper pipe

at outlet end of the 2 --in. (51 mm) trap (See Fig. 9). Do not
undersize the tube. Pitch the drain tube downward at a slope of at

least 1 in. for every 10 ft. (3 m) of horizontal run. Be sure to check

the drain trough for leaks. Prime the trap at the beginning of the
cooling season start--up.

Install Flue Hood

CARBON MONOXIDE POISONING HAZARD
Failure to follow this warning could result in personal

injury or death.
The venting system is designed to ensure proper venting.

The flue hood assembly must be installed as indicated in

this section of the unit installation instructions.

!

WARNING

Install the flue hood as follows:

1. This installation must conform with local building codes

and with the National Fuel Gas Code (NFGC), NFPA

54/ANSI Z223.1 (in Canada, CAN/CSA B149.1, and
B149.2) or latest revision. Refer to provincial and local

plumbing or wastewater codes and other applicable local
codes.

2. Remove flue hood from shipping location (inside the return

section of the blower compartment--See Fig. 8). Remove the
return duct cover to locate the flue hood. Remove two

screws on flue panel. Place flue hood assembly over flue
panel. Orient screw holes in flue hood with holes in the flue

panel.

3. Secure flue hood to flue panel by inserting a single screw on

the top and the bottom of the hood.

TRAP
OUTLET

1-in. (25 mm) min.

2-in. (51 mm) min.

A09052

Fig. 9 -- Condensate Trap

Install Gas Piping

The gas supply pipe enters the unit through the access hole

provided. The gas connection to the unit is made to the 1/2--in.
FPT gas inlet on the gas valve.
Install a gas supply line that runs to the heating section. Refer to

Table 2 and the current edition of NFGC in the U.S. and the current

NSCNGPIC in Canada. Do not use cast--iron pipe. It is
recommended that a black iron pipe is used. Check the local utility

for recommendations concerning existing lines. Size gas supply
piping for 0.5 IN. W.C. maximum pressure drop. Never use pipe

smaller than the 1/2--in. FPT gas inlet on the unit gas valve.
For natural gas applications, the gas pressure at unit gas connection
must not be less than 4.0 IN. W.C. or greater than 13 IN. W.C.

while the unit is operating. For propane applications, refer to
propane conversion kit instructions.
A 1/8--in. (3.2 mm) NPT plugged tapping, accessible for test gauge

connection, must be installed immediately upstream of the gas
supply connection to the gas valve and downstream of manual

equipment shutoff valve.
When installing the gas supply line, observe local codes pertaining

to gas pipe installations. Refer to the NFPA 54/ANSI Z223.1--2009

(in Canada, CAN/CSA B149.1).
NOTE: In the state of Massachusetts:

1. Gas supply connections MUST be performed by a licensed

plumber or gas fitter.

2. When flexible connectors are used, the maximum length

shall not exceed 36 in. (915 mm).

3. When lever handle type manual equipment shutoff valves

are used, they shall be T--handle valves.

4. The use of copper tubing for gas piping is NOT approved

by the state of Massachusetts.

In the absence of local building codes, adhere to the following
pertinent recommendations:

1. Avoid low spots in long runs of pipe. Grade all pipe 1/4 in.

(6.35 mm) for every 15 ft (4.6 m) of length to prevent traps.

Grade all horizontal runs downward to risers. Use risers to
connect to heating section and to meter.

2. Protect all segments of piping system against physical and

thermal damage. Support all piping with appropriate straps,
hangers, etc. Use a minimum of one hanger every 6 ft. (1.8

m). For pipe sizes larger than 1/2 in., follow
recommendations of national codes.

3. Apply joint compound (pipe dope) sparingly and only to

male threads of joint when making pipe connections. Use
only pipe dope that is resistant to action of liquefied

petroleum gases as specified by local and/or national codes.
Never use Teflon tape.

4. Install sediment trap in riser leading to heating section (See

Fig. 10). This drip leg functions as a trap for dirt and

condensate.

5. Install an accessible, external, manual main shutoff valve in

gas supply pipe within 6 ft (1.8 m) of heating section.

6. Install ground--joint union close to heating section between

unit manual shutoff and external manual main shut off

valve.

7. Pressure test all gas piping in accordance with local and

national plumbing and gas codes before connecting piping

to unit.

NOTE: Pressure test the gas supply system after the gas supply
piping is connected to the gas valve. The supply piping must be
disconnected from the gas valve during the testing of the piping
systems when test pressure is in excess of 0.5 psig. Pressure test the
gas supply piping system at pressures equal to or less than 0.5 psig.
The unit heating section must be isolated from the gas piping
system by closing the external main manual shutoff valve and
slightly opening the ground--joint union.

577D

--

--

A