Providing proper electrical service, Plumbing requirements – Power Soak MX-220-H Owner's Manual User Manual
Page 46
45
Providing Proper Electrical Service
The system is completely pre-wired and tested at the factory, and a hard-wired connection
from an appropriate power source junction box is all that is required.
The installer is to provide a disconnect that should be incorporated in the fixed wiring.
Properly sized watertight conduit, fittings and parts are required, as well as the appropriate
gauge wire.
If your system is a “left-to-right” unit, you should locate the power source junction box at
the left end of the system. (The opposite would be true for a “right-to-left” system.)
Ideally, the junction box should be located on the wall directly behind the pump motor and
control panel.
A wiring diagram is located in the system’s control panel enclosure. Specific part numbers
and part information can be obtained from the factory by calling
800-444-9624.
Plumbing Requirements
Your unit requires the following plumbing connections:
• 3/4” (19mm) or 1/2” (12 mm) hot and cold water supply lines.
• One wastewater connection (minimum 1 1/2” / 38mm).