Chapter2, Installation and setup, Following safety information – Allied Telesis AT-8550 User Manual
Page 21: Verifying the switch package, Chapter 2

2-1
Chapter 2
Installation and Setup
This chapter describes the following:
" How to decide where to install the switch
" Gigabit Ethernet configuration rules
" How to install the switch in a rack or free-standing
" How to connect equipment to the console port
" How to check the installation using the Power On Self-Test (POST)
Following Safety Information
Before installing or removing any components of the switch, or before carrying out
any maintenance procedures, you must read the safety information provided in
Appendix A of this guide.
Verifying the Switch Package
Check your package for the following contents:
" One gigabit Ethernet switch (AT-9108, AT-8518, AT-8525 or AT-8550)
" Two rackmount brackets and eight flathead screws
" Four self-adhesive rubber feet
" One power cord
" This installation guide
" One warranty card
If any of the above items are damaged or missing, contact your Allied Telesyn
representative.