beautypg.com

Chapter2, Installation, Before you proceed – Allied Telesis AT-FS704 User Manual

Page 23: Verifying package contents, Before you proceed verifying package contents, Chapter 2

background image

7

Chapter 2

Installation

Before you Proceed

Before installing the AT-FS704, make sure you read “Electrical Safety and
Installation Requirements” on page i
ii.

Verifying Package Contents

Make sure that the package includes the following items:

One AT-FS704 10/100 Fast Ethernet Switch

One AC power cord (for the U.S., Continental Europe, and the U.K.
only)

Warranty card

This installation guide

Four rubber feet with adhesive backing (for desktop or shelf
installation only)

Wall mounting kit, which includes: two tapping screws and two plastic
anchors

If any of the above items are damaged or missing, contact your representative
immediately.