Selecting a Site

Be sure to observe the following site
requirements:

❑ Make sure you are placing the device in a

dust-free and moisture-free environment.

❑ Do not block the ventilation openings on

the unit. Allow at least 10 centimeters (4
inches) of space at the front and back of
the unit for ventilation.

❑ Make sure that the unit’s power is

accessible and cables can be connected
easily.

❑ Cabling should be away from sources of

electrical noise such as radios,
transmitters, broadband amplifiers,
power lines, and fluorescent fixtures.

❑ Do not place objects on top of the unit.
❑ Use dedicated power circuits or power

conditioners to supply power to the unit.

Refer to Table 2 for the cabling

specifications for the twisted pair ports.