beautypg.com

Allied Telesis AT-GS900/8E User Manual

Page 28

background image

Chapter 2: Installation

28

Warning

Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord.

5

6. Verify that the POWER LED is green. If the LED is OFF, refer to

“Troubleshooting” on page 33 for instructions.

Note

The switch perform a self-diagnostic test upon power up. This takes
about 20 seconds to complete.

7. Power ON the end-nodes connected to the switch.

8. Check that all the L/A LEDs are green. If any of the LEDs is OFF, refer

to “Troubleshooting” on page 33 for instructions.

The switch is now ready for use.

This manual is related to the following products: