beautypg.com

Unpacking the switch – Allied Telesis AT-GS900/8E User Manual

Page 26

background image

Chapter 2: Installation

26

Unpacking the Switch

To unpack an AT-GS900/xE switch, perform the following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.

3. Verify that the following hardware components are included in your

switch package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.

ˆ

One AT-GS900/xE Gigabit Ethernet switch

ˆ

Four self-adhesive rubber feet

ˆ

Wall-mounting kit

ˆ

External power supply

ˆ

Documentation CD

ˆ

Warranty card

This manual is related to the following products: