beautypg.com

Allied Telesis AT-GS900/8 User Manual

Page 39

background image

AT-GS900/8 Gigabit eco-friendly Ethernet Switches Installation Guide

39

10. Power ON the end-nodes connected to the switch.

11. Check that all the L/A LEDs are green or blinking green for the ports

connected to end-nodes. If any of the LEDs are OFF, refer to
“Troubleshooting” on page 41 for instructions.

The switch is now ready for use.