beautypg.com

Allied Telesis AT-GS900/8 User Manual

Page 36

background image

Chapter 2: Installation

36

7. Verify that the POWER LED is green. If the LED is OFF, refer to

“Troubleshooting” on page 41 for instructions.

Note

The switch perform a self-diagnostic test upon power up. This takes
about 20 seconds to complete.

8. Power ON the end-nodes connected to the switch.

9. Check that all the L/A LEDs are green or blinking green for the ports

connected to end-nodes. If any of the LEDs are OFF, refer to
“Troubleshooting” on page 41 for instructions.

The switch is now ready for use.